A CleanTech startup in Portland Oregon called LucidEnergy has announced that they’ve found a way to create clean energy in a segment of water pipe. Lucid’s method involves pipes that have been fitted with a simple 5 turbine system. These special pipes could be installed when a utility replaces a segment of pipe.
How effective is it?
Gregg Semler, LucidEnergy’s President and CEO says that a stretch of pipe carrying water downhill might be able to produce enough electricity to power 100 homes. Impressive. Not only that but all around it’s cheaper. Semler says that without any government subsidies the cost of installing his pipe method is three to four times better than solar or wind systems.
LucidEnergy’s first public test of this technology will start next week on April 26th. That’s when the project opens at Riverside Public Utilities in Southern California. Riverside has tested four generations of the system over the last two years. This last test has gone flawlessly according to cities assistant general manager for water Kevin Milligan.
“I think it’s great technology,” Milligan told the Portland Tribune. “It could be widely adopted by water utilities and result in some significant cost savings. And it’s green.” The power generated from the Riverside test site is said to be enough to power 14 miles of street lights. Milligan says that after labor and capital construction, energy is his third highest expense. At his water fields in San Bernadino, CA he pays $.13 to $.25 per kilowatt hour. The Lucid system produces energy at a cost of $.05 to $.09 per kilowatt hour which is a significant savings.
Riverside will be the first city to publicly test the service however there has already been interst from San Antonio and New York as well as Israel and Zambia.
source: PortlandTribune